Case Study: Min Yr Allt, Neath.

Complete refurbishment of the kitchen including the removal of its pantry.

The kitchen fittings and pantry are removed as instructed.

The next step is to block up the window next to the kitchen doorway.

The window is blocked off and plastered. Now the kitchen is ready for carpentry and painting work to start.

The ceiling is removed in preparation to overboard.

The walls are skimmed with fresh plaster.

The site of the old pantry is skimmed and prepared for painting.

All new carpentry has been fitted along the doors and coving is then installed.

Kitchen is fully fitted including tiling work on the walls, just the painting left to do.

The kitchen doorway is given a last coat of paint.

The finished kitchen.